Interconnecting with DP&L

Renewable energy and disbursed energy production (such as hydroelectric plants, wind turbines, solar cells and fuel cells) are growing in popularity.  If you are considering the installation of electric generating equipment and plan to interconnect to the DP&L distribution system, please consult the information listed below to assure your safe installation and reliable service. 


Interconnection Information

The process, timeframe and fees associated with interconnecting with the DP&L distribution system.

   

Billing and Payment

Section D of this document describes Net Metering for interconnection of your system with DP&L.

   

Application

Agreement

Sets out in detail the responsibilities of both you as the Interconnection Service Customer and DP&L for equipment generating 50 kilowatts (kW) or less.

If you are installing more than 50 kW, please call 937-259-7236.

 

Technical Requirements

E xplains the technical requirements in order for your interconnection to be safe for DP&L workers and your family.

   

Interconnection Screening Process

Outlines the screening process used to determine the feasibility of the interconnection and any additional review and/or study that may be needed.

   

 

Contact Us

For more information about Interconnecting with DP&L, contact:

 

Email

interconnections@dplinc.com

   

Phone

937-259-7236

   